| OP | OPERATION | ROUTED HRS | ACTUAL |
|---|---|---|---|
| 10 | Saw cut | 1.5 | 1.6 |
| 20 | CNC turn – setup | 1.0 | 3.8 |
| 30 | CNC mill | 6.2 | 6.5 |
| 40 | Deburr & inspect | 2.0 | 2.3 |
A machinist sees the machine. A manager sees the schedule. The ERP team sees the data. I’ve done all three jobs, so I follow the problem wherever it goes.
Setup, tooling, workholding, operation sequence, the CNC program and cycle time. What the operator actually does, compared with what everyone thinks they do.
Bottlenecks, queues, handoffs, rework loops and inspection. Where jobs wait, where they come back and where the work gets done differently from shift to shift.
Routings, standards, BOMs, labor reporting and job cost. Why the ERP says a job made money when the floor knows it didn’t.
Here is the first question I’d ask, and the first places I’d look.
You don’t need another full-time hire. You need the problem solved and the fix to hold.
One problem that keeps coming back. I look at it on the floor and in your data, talk to the people doing the work, and give you a short written report with the likely root causes and what to fix first.
Machine choice, operation sequence, setup, tooling, workholding, programs, inspection and cycle time.
Quoted against actual for material, setup, labor, secondary operations and scrap, and where the ERP disagrees with the floor.
Follow a process end to end to find waste, bottlenecks, rework, poor handoffs and weak controls.
Assign the actions, test the changes, measure the result and make the better method the standard one.
A few hours a month as an outside set of eyes for an owner or plant manager.
Practical sessions for supervisors, programmers and planners, or an independent check before a big machine, CAM, ERP or sourcing decision.
You describe the problem. I ask how long, how often, and what changed.
On the floor with your people, then the drawings, routings, programs and job history.
Symptoms separated from causes. A short list of practical changes, in order.
We measure whether the fix holds. If it doesn’t, we go back to Op 20.

A five-year indentured apprenticeship at Lucas Aerospace in Bradford, England, then more than 55 years making metal and plastic parts in small and large quantities, on manual lathes, mills and grinders, legacy machines and CNC.
I have worked as a toolroom machinist and production supervisor in South Africa, a works manager in the UK, and a CNC programmer, manufacturing engineer and manufacturing manager in the United States, for companies including Wyman Gordon, Harley-Davidson, Norriseal and Winchester Interconnect.
I set up Bickerdyke Manufacturing Advisory to put that experience to work for small and mid-sized manufacturers: finding the real cause of the problems that keep coming back, and making sure the fix holds.
Selected results from my career, before Bickerdyke Manufacturing Advisory.
A newly purchased machine sat idle, not yet commissioned or integrated into the flywheel production cell.
Commissioned and programmed the machine, then integrated it into the cell’s existing flow.
The cell could produce every flywheel assembly Harley-Davidson had ever made, complete, in a single cell.
A 30-machine shop with ageing equipment, no formal scheduling, and pressure to improve efficiency while outsourcing was being considered.
Made the case for keeping manufacturing in-house. Replaced nearly 20 old machines with around 9 new multi-function CNC machines, including twin-spindle turn-mill machines that finish many parts complete. Rebuilt the DNC system from manual to automated, wireless delivery, and introduced Jobpack scheduling and labor tracking.
Two separate business systems. Material was not issued to jobs, so inventory was corrected by monthly counts and adjustments. An ageing machine shop, and no visibility of upcoming work.
Consolidated onto one business system and introduced material issuing to jobs. Added 17 new CNC machines while retiring older equipment. Introduced Jobpack AIR scheduling and labor data collection, shown on large screens on the floor.
Machinists could see and plan their own upcoming work.